AD Facility
Malaby Biogas Ltd is set in a rural location, near the western boarder of Wiltshire on the edge of Warminster.
Malaby has been in operation since 2012, processing 500 to 600 tonnes of organic waste each week and supplying renewable power to approximately 2,500 homes. The facility is permitted to receive up to 40,000 tonnes of waste annually. Bacteria break down the organic material in one of the two digesters, producing biogas that powers the engines, as well as a liquid fertiliser that complies with PAS 110 standards.
Contact:
AD Plant:
Telephone: 01985 216976
Hours of Operation:
AD Plant: 07:30 – 16:30 Monday to Friday
Appointments by arrangement
Site Permit Numbers: EPR/AB3036RT
AD Plant –
Request a Call Back
Request a Call BackIf you would like to talk to one of the team please use the below contact form